Give us a call
Kiwa PI Berlin will perform the witnessing of transformer Factory Acceptance Tests (FAT) to ensure it is aligned with the design, manufacturing and acceptance requirements. We will focus on the supervision of laboratory conditions and standards compliance , laboratory capabilities, health and safety, signalling, interlocks and ensuring that the international standards are applied.