> CONSTRUCTION PHASE
As an example of our materials recycling efforts, Raba Kistner’s materials consultants, engineers, and laboratory technicians can develop mix designs that incorporate recovered materials to meet Texas Department of Transportation (TxDOT) standards and local government regulations. Our team typically performs Daily Quality Assurance tests to document that products conform to project specifications.
Our construction materials recycling services include:
- Pre-demolition assessment evaluation of recyclable materials
- Mix design development using recycled materials
- Research and testing programs for reuse of perceived wastes
- Quality Control/Assurance testing during processing and construction