Draft BRL K17201, parts 1 and 2 published for comments
The revised draft-evaluation guideline BRL K17201, parts 1 and 2 for the renovation of drinking water piping systems with cured-in-place pipe technology (factory impregnated liner systems) has been published for comments.
BRL K17201, part 1 for the renovation of drinking water pipes - Part 1 – Design and Installation of Cured-in-Place Pipe (CIPP) – Factory Impregnated Liner Systems
BRL K17201, part 2 for the Kiwa-(technical-approval-with) product certificate for the renovation of drinking water piping systems – part 2 – Products for cured in place pipes (CIPP) – factory impregnated liner systems
In the BRL K17201, parts 1 and 2, the following updates have been implemented:
BRL K17201, part 1
-
- In accordance with the new (Dutch) Kiwa template, several general texts have been updated;
- Reference to and harmonisation with the (new) EN-ISO 11298, parts 1 and 4 regarding the product requirements and ISO/TS 23818, part 2 regarding conformity assessment aspects.
BRL K17201, part 2
-