22 December 2021

Concept BRL’s 2020-1 en 2020-2 published for comments

On December 22, 2021 Kiwa publishes the Draft Evaluation Guidelines BRL 2020-1 and BRL 2020-2 d.d. 21 december 2021;  TPE pipe joint seals for non-pressure waste water and drainage – MATERIAL & SEALS,  for comments.

Untill Februari 12, 2022 both guidelines mentioned are available for comments at Kiwa Nederland B.V.

The most important changes are:

  • Another approach for the requirements for tensile strength and elongation at break;
  • Another interpretation of the results of the stress relaxation test.

Applying comments

Please use the comment template to sent in your comments. The comments can be sent to:

Kiwa Nederland B.V.
T.a.v. de heer Hans van der Meer
E-mail: hans.van.der.meer@kiwa.com   
Postbus 70
2280 AB RIJSWIJK

Comments received after February 12, 2022 will be handled as not been sent.

Downloads

Concept BRL 2020-1.pdf
Concept BRL 2020-2.pdf
Comment form BRL 2020-1.docx
Comment form BRL 2020-2.docx