PROJECT DETAILS
To better facilitate a growing city, the low-floor Light Rail Tunnel (LRT) was a major focus in the latest Edmonton transit plan. The LRT was designed to include 27km of double track with a 500m tunnel, 2km on elevated structure as well as 28 new stations.